Proposal/Bids
PUBLISHED: Monday November 13, 2006

ANNUAL CONSULTANT PRE-QUALIFICATION
SAN DIEGO STATE UNIVERSITY - PUBLIC WORKS PROJECTS
---

All Consulting Architects, Engineers, Specialty Designers, Construction Managers, Inspectors and Construction Specialists must be pre-qualified to participate in Public Works projects at California State University, SDSU. Pre-qualification will be for work solicited during the 2007 calendar year. This excludes Project Architects & engineers, which are pre-qualified with the Chancellor’s Office, CPDC.

Licensed and experienced firms must complete a Consultant’s Qualification Questionnaire indicating areas of expertise. Download this form at http://bfa.sdsu.edu/fpm/forms.htm or receive it by Fax or Email by calling 619-594-5224. We will accept responses until January 31, 2007.
Pub. Nov. 13,15,20,22-00015748

Bird Rock Maintenance Assessment District
Request for Quotation
Landscape Maintenance Services
-------

The Bird Rock MAD seeks quotations from well qualified contractors to maintain public landscaping along La Jolla Boulevard between Midway Avenue and Colima Avenue in the Bird Rock neighborhood of La Jolla in the City of San Diego, California. The submission deadline is Fri, December 15, 2006. Pre-bid Conference and Site Inspection is Monday, November 20, 2006.  For more information please call 619-972-4705 or email BirdRockMAD@san.rr.com.
Pub. Nov 7, 8, 9, 10, 13-00015507
 

The City of Del Mar
NOTICE INVITING BIDS
---

The City of Del Mar, OWNER, invites sealed bids for:

CONSTRUCTION OF THE
POWERHOUSE PARK PATHWAY IMPROVEMENTS PROJECT

RECEIPT AND OPENING OF PROPOSALS:
Sealed proposals will be received at the office of the City Clerk, City of Del Mar, located at 1050 Camino Del Mar, Del Mar, California, 92014, until 2:00 p.m. on November 28, 2006 at which time they will be publicly opened and read aloud at said office.

DESCRIPTION OF WORK: The WORK to be done for this project consists of AC pavement removal and replacement on Coast Boulevard as necessary to accommodate the addition of two loading/unloading spaces, removal and replacement of PCC curb, gutter and sidewalk, minor grading, and landscape and irrigation modifications as necessary to realign and reconstruct the existing PCC pathway adjacent to and within Powerhouse Park to comply with ADA standards for grade and cross-slope.

ENGINEER'S ESTIMATE: The engineer's estimate for this project is roughly $100,000.

COMPLETION OF WORK: All WORK must be completed within 45 working days after the commencement date stated in the Notice to Proceed which will be issued within the last two weeks of December, 2006. The majority of this contract must be completed during the month of January, 2007.

PRE-BID CONFERENCE: None.

MANDATORY PRE-CONSTRUCTION CONFERENCE: A MANDATORY pre-construction conference will be required. The date, time and location of the pre-construction meeting will be determined after award of the contract.

OBTAINING CONTRACT DOCUMENTS: Contract document books, contain¬ing proposal forms, agreement, specifications, and reduced drawings, may be obtained starting November 9, 2006 from Scantech, Inc. located at 7150 Engineer Road, San Diego, CA 92111 at (858) 495-0727 for the non-refundable cost of printing. The scale of the reduced drawings is about one-half of the original scale. If full-scale drawings are desired they may be purchased from Scantech. at reproduction cost.

BID SECURITY: Bid Security shall accompany the bid in the form of a certified or cashier's check, or a Bid Bond made payable to the OWNER in the amount of ten percent of the total bid amount.

PERFORMANCE AND PAYMENT BONDS: The successful bidder will be required to furnish a Payment Bond made payable to the OWNER in the amount of one hundred percent, and a Performance Bond made payable to the OWNER in the amount of one hundred percent of the contract amount.

WAGE RATES: Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at City of Del Mar address and available from the California Department of Industrial Relations' Internet web site at http://www.dir.ca.gov.

CONTRACTOR'S LICENSING LAWS: Attention is directed to the CONTRACTOR's License Law concerning the licensing of CONTRACTOR's. CONTRACTOR's are required to be licensed and regulated by the CONTRACTOR's State License Board.

WITHDRAWAL: Withdrawal of bids shall not be permitted for a period of seventy-five (75) days after the date set for the opening thereof.

RETAINAGE FROM PAYMENTS: Monies withheld by the OWNER to ensure performance under the contract may be released in accordance with Government Code Section 4590 and these contract documents.

PROJECT ADMINISTRATION: All questions relative to this project prior to the opening of bids shall be directed to the ENGINEER for the project listed below. It shall be understood, however that no specification interpretations will be made by telephone, nor will any "or equal" products be considered for approval prior to the bid opening.
PBS&J
9275 Sky Park Court, Suite 200
San Diego, CA 92123
Telephone: (858) 514-1039
Attention: Rick St. John

OWNER'S RIGHTS RESERVED: The OWNER reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the OWNER.
Pub. Nov. 6,13-00015455


Proposal/Bids
PUBLISHED: Monday November 13, 2006