NOTICE OF PUBLIC HEARING
---
NOTICE IS HEREBY GIVEN in accordance with Water Code Section 13147 that a public hearing will be held by the State Water Resources Control Board (State Water Board) to seek comments on the proposed Total Residual Chlorine and Chlorine-Produced Oxidants Policy of California (Policy) and accompanying Substitute Environmental Document (SED). The Policy will affect entities who discharge to the State's inland surface waters, enclosed bays, and estuaries of California and will occur through the issuance of National Pollutant Discharge Elimination System (NPDES) permits. The purpose of this Policy is to (1) establish total residual chlorine (TRC) and chlorine-produced oxidant (CPO) objectives to protect aquatic life beneficial uses by adopting U.S. Environmental Protection Agency (U.S. EPA) 304(a) criteria, (2) provide consistent procedures that apply to NPDES permits that contain one or more numeric water quality-based effluent limitations to regulate discharges, and (3) supply a basis for equitable enforcement of violations of TRC or CPO effluent limitations in NPDES permits.

Informational documents on the proposed draft Policy may be obtained via the Internet on the State Water Board Web site at http://www.waterboards.ca.gov . Copies can also be received by contacting: Dena McCann, Division of Water Quality, State Water Resources Control Board, 1001 I Street, Sacramento, CA 95814, (916) 323-9690, FAX: (916) 341-5584, email: dmccann@waterboards.ca.gov

Persons wishing to comment or make recommendations on the draft Policy, SED, and Economic Analysis at the public hearing should submit written comments, or a summary of their comments, in advance of the hearing. Written comments are due by 5 p.m., June 5, 2006. Please indicate in the subject line, Comments - Chlorine Policy, and submit to:
Song Her, Clerk to the Board, State Water Resources Control Board, Executive Office
1001 I Street, 24th Floor, Sacramento, CA 95814, Fax: (916) 341-5620; Email: commentletters@waterboards.ca.gov At the hearing, participants are encouraged to briefly summarize their written comments. Time limitations on oral presentations may be imposed. Persons with similar views are encouraged to make joint presentations. The State Water Board will consider all comments before taking final action on the proposed draft documents. The State Water Board may take action at this hearing or may defer action to a later noticed Board meeting.
4/21/06
CNS-957550#
THE DAILY TRANSCRIPT
Pub. April 21-00005219

COUNTY OF SAN DIEGO
NOTICE TO CONTRACTORS
---
The County of San Diego, Owner, invites sealed bids for CONSTRUCTION OF LOS COCHES CREEK SEWER IMPROVEMENTS, (RFB 1396). Sealed bids will be received at the Office of Purchasing and Contracting, Lobby Front Desk, County Operations Center, 5555 Overland Avenue, Suite 1111 (Bldg 11), San Diego, California, 92123-2149, until 2:00 p.m. on May 11, 2006, at which time they will be publicly opened and read aloud. The Contractor shall possess, at the time of submitting the bid, a California contractor's license, Classification A, General Engineering Contractor, or a Classification C-34, Pipeline Contractor. An inspection of the project construction area is scheduled for 10:00 a.m. on April 27, 2006. Contractors are to assemble at the driveway to the Rancho Los Coches RV Park on Highway 8 Business (Business Route 8), approximately 0.4 miles east of Los Coches Road (Thomas Guide 1232, G6). Work to be Done consists in general of replacement of an existing sewer pipeline with an 18" polyvinyl chloride sewer pipeline and includes earthwork, including rock excavation, temporary sewer by-pass system, manhole construction, placement of cellular concrete mats and concrete armor units for permanent erosion protection, traffic control and detour signing, preparation of stormwater pollution prevention plan and implementation of water pollution control measures. The project is located in the vicinity of Lakeside. The cost of construction is estimated to be from $700,000 to $900,000. Contract Documents, including reduced Plans only, Specifications and Proposal Forms, may be examined or purchased for the sum of $23 per set at the County of San Diego, Department of Purchasing and Contracting, Cashier, Building 11 (MS O32), County Operations Center, 5555 Overland Avenue, Suite 1111, San Diego, CA 92123-1249. Full-size plans may be obtained at the Dept of Purchasing and Contracting, referenced above, at an additional cost of $7 per set. Only complete sets of full-size plans will be sold. Full-size plans will not be sent to full-size plan holders when plans are revised and issued as addenda unless re-ordered. Only revised reduced plans will be issued as necessary with addenda. Full-size plans will contain only the revisions made to the plans at the time of issuance. Make checks payable to County of San Diego; no refund will be made. All prices include tax. Mail service is available only to those prospective bidders outside a 30 mile radius of the County Operations Center and at an additional cost of $5 per set of documents. For mail service contact cashier at (858) 694-3062. NOTE: Contract documents should be available for purchase after 1pm on Mon 4-17. CONTACT CASHIER TO CONFIRM AVAILABILITY. The following report is available for review at the Department of Purchasing and Contracting, Cashier, at the location referenced above. A copy will also be provided with the purchase of the Contract Documents. This report is provided for informational purposes only, and is not part of this Contract. “Geotechnical Report, Los Coches Creek Sewer Improvements, Lakeview Area, San Diego County, California, prepared by GeoLogic Associates, dated January 5, 2005 (50 pages).” Cross sections are not available for this project. A Disabled Veterans Business Enterprise (DVBE) goal of three percent (3%) has been established for this project. The list of certified DVBEs is available at the following website: http://www.osmb.dgs.ca.gov/bis_queries/bis_queries_menu.asp. Bid security of no less than 10% is required at time of bid. Payment and Performance Bonds: successful bidder shall provide Payment and Performance Bonds for 100% of the contract amount. Prevailing Wage rates apply. Complete bid information, including Engineer's estimate of the work, is available at the County of San Diego Purchasing and Contracting website at http://buynet.sdcounty.ca.gov/
Contact Roberta Lamp Procurement Contracting Officer at 858-694-2160 (email:Roberta.Lamp@sdcounty.ca.gov County of San Diego Department of Purchasing and Contracting, 5555 Overland Avenue, Building 11, San Diego, CA 92123.
Pub. April 14,17,18,19, 20, 21, 24, 25, 26, 27-00004871

COUNTY OF SAN DIEGO
NOTICE TO CONTRACTORS
---
The County of San Diego, Owner, invites sealed bids for CONSTRUCTION OF STAGE COACH LANE IMPROVEMENTS, (RFB 1406). Sealed bids will be received at the Office of Purchasing and Contracting, Lobby Front Desk, County Operations Center, 5555 Overland Avenue, Suite 1111 (Bldg 11), San Diego, California, 92123-2149, until 2:00 p.m. on May 10, 2006, at which time they will be publicly opened and read aloud. The Contractor shall possess, at the time the Contract is awarded, a California contractor's license, Classification A, General Engineering Contractor, or a Classification C-12, Earthwork and Paving Contractor. Work to be done consists in general of the widening of Stage Coach Lane between Mission Road and Knollwood Avenue (approximately 0.47 miles) and improvements to Fallbrook High School parking areas. The project includes earthwork, placing aggregate base, asphalt concrete and asphalt concrete dikes, planing asphalt concrete, cleaning and sealing random cracks and repairing distressed pavement, placing reinforced concrete pipe and corrugated steel pipe, constructing masonry block wall, constructing concrete curb inlets, cleanout, headwall, wall footing, pipe invert liner, curb, curb and gutter, sidewalk, driveways, pipe collars and lug, constructing chain link fencing, traffic striping and marking, traffic striping removal, traffic control and implementation of water pollution control measures. The project is located in the vicinity of Fallbrook. The cost of construction is estimated to be from $700,000 to $900,000. Contract Documents, including reduced Plans only, Specifications and Proposal Forms, may be examined or purchased for the sum of $19 per set at the County of San Diego, Department of Purchasing and Contracting, Cashier, Building 11 (MS O32), County Operations Center, 5555 Overland Avenue, Suite 1111, San Diego, CA 92123-1249. A set of full-size plans may be obtained at the Dept of Purchasing and Contracting, referenced above, at an additional cost of $7 per set. Only complete sets of full-size plans will be sold. Full-size plans will not be sent to full-size plan holders when plans are revised and issued as addenda unless re-ordered. Only revised reduced plans will be issued as necessary with addenda. Full-size plans will contain only the revisions made to the plans at the time of issuance. Soils reports are not available for this project. A cross sections pkg (38 sheets) used in the design of this project is available for review or purchase at a cost of $19 at the Department of Purchasing and Contracting, location referenced above. These are provided for informational purposes only, and are not part of this Contract. Make checks payable to County of San Diego; no refund will be made. All prices include tax. Mail service is available only to those prospective bidders outside a 30 mile radius of the County Operations Center and at an additional cost of $5 per set of documents. For mail service contact cashier at (858) 694-3062. NOTE: Contract documents should be available for purchase after 1pm on Wed Apr 12. CONTACT CASHIER TO CONFIRM AVAILABILITY. A Disabled Veterans Business Enterprise (DVBE) goal of three percent (3%) has been established for this project. The list of certified DVBEs is available at the following website: http://www.osmb.dgs.ca.gov/bis_queries/bis_queries_menu.asp. Bid security of no less than 10% is required at time of bid. Payment and Performance Bonds: successful bidder shall provide Payment and Performance Bonds for 100% of the contract amount. Prevailing Wage rates apply. Complete bid information, including Engineer's estimate of the work, is available at the County of San Diego Purchasing and Contracting website at http://buynet.sdcounty.ca.gov/
Contact Roberta Lamp Procurement Contracting Officer at 858-694-2160 (email:Roberta.Lamp@sdcounty.ca.gov County of San Diego Department of Purchasing and Contracting, 5555 Overland Avenue, Building 11, San Diego, CA 92123.
Pub. April 13,14,17,18,19, 20, 21, 24, 25, 26-00004792

SAN DIEGO COUNTY WATER AUTHORITY
CONTRACTOR OPEN HOUSE
---
The San Diego County Water Authority (Water Authority) is soliciting input from construction contractors to help craft the upcoming bid package for the following projects.

Title: San Vicente Surge Control Facility, San Vicente Pump Station and Reservoir Interconnect Pipeline projects

Information: For an agenda summary, a list of desired trades and other details, access to the following web link will be available on Tuesday, April 25 at: http://www.sdcwa.org/infra/esp-sanvicentecontractor.phtml
For general information or to RSVP for the session you will attend, contact Alex Newton at (858) 522-6710 or anewton@sdcwa.org. Please RSVP by Monday, May 15.

EVENT DATE: May 18, 2006, Session 1: 9:30 a.m. - noon
Session 2: 1:00 p.m. - 3:30 p.m.

EVENT LOCATION: San Vicente Reservoir in Lakeside
San Vicente Construction Management Office Complex
12393 Moreno Avenue, Lakesid

Description:
The Water Authority's Capital Improvement Program includes $90 million for a pump station, surge control facility, and interconnect pipeline at the San Vicente Reservoir site. These facilities are components of the Emergency Storage Project water delivery system that will be used to transport water between the San Vicente Reservoir and the Second Aqueduct. The facilities are anticipated to be constructed over the next three years.

The Water Authority is hosting an open house as an opportunity for construction contractors and subcontractors to provide input to the Water Authority on packaging the projects for bidding. The open house will include a tour of the project site, a preview of project plans and specifications, and meet and greet the designers, construction managers, and Water Authority staff involved in the project.
Contractors shall provide their own transportation to the San Vicente Reservoir site. Follow the signs to the Water Authority facilities.