PUBLIC NOTICES
Published In The Daily Transcript
Advertised public notices, printed in a newspaper of general circulation, are required by California law. Within the individual category, notices are arranged by print publish day in reverse chronological order.
Online, on a selected date, the notices are arranged in alphabetical order.

802 Proposals/Bids
PUBLISHED: Tuesday May 03, 2005


NOTICE TO REQUEST BIDS For
Sweetwater Union High School District
---
Bid Packages: 2B-Earthwork/Paving, Pavement Markings & Wet Utilities
5A-Structural Steel & Miscellaneous Metals

PROJECT NAME: Mar Vista Middle School Modernization 1A
Location: San Diego, CA
Bid Date: Tuesday, May 10, 2005, 2:00 pm, Sealed bids will be accepted at the
following address: 2710 Iris Avenue, San Diego, CA 92154 at the Swinerton
Management & ConsultingÕs project jobsite trailer at the Southwest
Middle School from 9 am to 2pm
IMPORTANT: The construction entrance is off of 27th street
Owner: Sweetwater Union High School District
Owner Address: 1130 5th Avenue, Chula Vista, CA 91911
Owner Estimate: $4.5 million; package 2B Ð $400,000; package 5A Ð $450,000
Contact: Construction Mgr.: Swinerton Management & Consulting, Attn: Brett Horgan Phone (619) 243-6281, Fax (619) 575-1928
Project Address: 1267 Thermal Avenue, San Diego, CA 92154
This project is a Multiple Prime Bid Project.
Project Description: The project, MAR VISTA MIDDLE SCHOOL MODERNIZATION 1A consists of construction of shade shelters and a new passenger drop-off zone along Thermal Street. Demolition and reconstruction of outdoor seating and platform area. Alterations to buildings 100, 200, 400 & 500. Building 200 shall be completely modernized. Building 100 shall be upgraded for accessible entry. Building 400 & 500 shall be upgraded for accessible toilet rooms. The approximate area the buildings is 11,000 SF. New water, sewer, storm drain, gas, electrical and technology infrastructure is included in the work as well as ADA site work, landscaping and irrigation systems.
The Project includes, but is not limited to the following bid packages: 1D-Final Clean; 1E-Surveying; 2A-Demo/ACM & Lead Abatement; 2B-Earthwork/Paving, Pavement Markings & Wet Utilities; 2C-Landscape, Irrigation and Tree Protection; 3A- All Concrete & Masonry; 5A- Structural Steel & Misc. Metals; 6A- Rough Carpentry; 6B- Finish Carpentry; 7A- Roofing, Skylights & Sheet Metal; 8A- Doors, Frames & Hardware; 8B-Windows & Glazing; 9A- Drywall/Stucco & Interior Finishes; 9B- Ceramic Tile; 9C- Flooring; 9D-Painting; 10A- Specialties; 10B- Signage; 15A- All Mechanical, Plumbing & HVAC; 16A- Electrical.
Pre-Bid Requirements: Mandatory pre-bid meeting / walks on Thurs., May 5, 2005 at 3 pm, meet in front of the schoolÕs Cafeteria. 1267 Thermal Ave., San Diego 92154.
Plans and specs. are available at Swinerton Management & ConsultingÕs project jobsite trailer located at 2710 Iris Avenue for a deposit of $250(RF), make checks payable to SWEETWATER UNION HIGH SCHOOL DISTRICT.
All L/E/M/W/DBE/DVBE Contractors and suppliers are invited to submit bids for the above prime bid project, in order to achieve a 3% participation.
Pub. April 26, May 2-k113806




802 Proposals/Bids
PUBLISHED: Tuesday May 03, 2005


Browse By Publication Date Months in 2005 Days in May 2005
2005 Public Notices
May
05/03/2005