SAN DIEGO UNIFIED SCHOOL DISTRICT
Advertisement for Bids
REVISED 8/6/2013
---
Notice is hereby given that the San Diego Unified School District, acting by and through its governing board, will receive sealed bids for the furnishing of all labor, materials, transportation, equipment, and services to:

UPGRADE VIDEO PRODUCTION SYSTEM AT
EUGENE BRUCKER EDUCATION CENTER AUDITORIUM

A mandatory site visit is scheduled for 9:00 a.m. on AUGUST 15, 2013
in front of Eugene Brucker Education Center, 4100 Normal Street, San Diego, CA 92103. PLEASE SEE BID FOR DETAILS. (No.CC-14-0304-29)

All bids must be received at or before 1:00 p.m. on AUGUST 27, 2013, at the Strategic Sourcing and Contracts Department, 2351 Cardinal Lane, Bldg. M, San Diego, CA 92123, at which time bids will be publicly opened and read aloud.

The project estimate range is between $170,000 and $200,000. The District requires that Bidders possess any of the following classification(s) of California State Contractors License(s), valid and in good standing, at the time of bid opening and contract award: C-7, C-10 or other appropriate license.

All late bids shall be deemed non-responsive and not opened. Each bid shall be in accordance with all terms, conditions, plans, specifications and any other documents that comprise the bid package. The Bid and Contract Documents are available in three formats, hard copy, CD, or online from Plan Well. Hard copy bid documents are available at American Reprographics Company (ARC), 1200 4th Avenue (4th and B Street), San Diego, CA 92101, phone number 619-232-8440, for a refundable payment of Two Hundred Dollars ($200) per set; CD's are available for a non-refundable charge of $50. Payments shall be made by check payable to SAN DIEGO UNIFIED SCHOOL DISTRICT. If the payment for Bid and Contract Documents is refundable, refunds will be processed by the District only if the Bid and Contract Documents, including all addendums, are returned intact and in good order to ARC within ten (10) days of the issuance of the Final Bid Tabulation. Online documents are available for download free of charge on PlanWell through ARC. Go to www.crplanwell.com, click on Public Planroom (Questions? 714-434-8525). All bids shall be submitted on bid forms furnished by the District in the bid package beginning August 6, 2013. Bid packages will not be faxed.

As of January 1, 2012, the San Diego Unified School District no longer administers the in-house Labor Compliance Program for all new construction projects. Prevailing wage requirements will still apply to all public works projects and must be followed per Article 18 of the General Conditions of this bid.

WAGES: The Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in the locality in which this public work is to be performed for each craft, classification, or type of worker needed to execute the contract. Copies of that determination are available at the District's Labor Compliance Office for interested parties upon request; or may be found on the internet at: http://www.dir.ca.gov/DLSR/PWD.It shall be mandatory upon the contractor to whom this contract is awarded and upon any subcontractor under him to pay not less than the said specified rates to all laborers, workmen, and mechanics employed by them in the execution of the contract.

DISABLED VETERAN BUSINESS ENTERPRISE PARTICIPATION PROGRAM: Pursuant to Resolution In Support of Service Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, the Bidder is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. In compliance with this Program, the Bidder shall satisfy all requirements enumerated in the bid package.

Each bid must be submitted on the Bid Form provided in the bid package and shall be accompanied by a satisfactory bid security in the form of either a bid bond executed by the bidder and Surety Company, or a certified or cashier's check in favor of the San Diego Unified School District, in an amount equal to ten percent (10%) of their bid value. Said bid security shall be given to guarantee that the Bidder will execute the contract as specified, within five (5) working days of notification by the District.

The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding. No bidder may withdraw his bid for a period of 120 days after the date set for the opening of bids. For information regarding bidding, please call 858-522-5831.

SAN DIEGO UNIFIED SCHOOL DISTRICT
Arthur S. Hanby, Jr., CPPO, C.P.M., CPPB, A.P.P
Strategic Sourcing and Contracts Officer
Strategic Sourcing and Contracts Dept
NO. CC-14-0304-29
Advertised Dates:08/06/13, 08/07/13, 08/13/13 -00113119




SAN DIEGO UNIFIED SCHOOL DISTRICT
Advertisement for Bids
---

Notice is hereby given that the San Diego Unified School District, acting by and through its governing board, will receive sealed bids for the furnishing of all labor, materials, transportation, equipment, and services to:

FURNISH AND INSTALL HVAC SYSTEMS AND ALL ASSOCIATED WORK AT
DISTRICT SCHOOL SITES - REGION 1 (IDIQ)

A mandatory site visit is scheduled for 9:00 a.m. on AUGUST 22, 2013
outside the main office of Scripps Ranch High School, 10410 Treena Street, San Diego, CA 92131. Upon completion, contractors will proceed to Lewis Middle School, 5170 Greenbrier Avenue, San Diego, CA 92120. Upon completion, contractors will proceed to Marshall Elementary School, 3550 Altadena Avenue, San Diego, CA 92105. Contractors must be present at all 3 sites to be able to bid this project. PLEASE SEE BID FOR DETAILS. (No.CZ-14-0297-08)

All bids must be received at or before 1:00 p.m. on SEPTEMBER 9, 2013, at the Strategic Sourcing and Contracts Department, 2351 Cardinal Lane, Bldg. M, San Diego, CA 92123, at which time bids will be publicly opened and read aloud.

Under Public Contract Code 3400, the District has made a finding that the following particular materials, products, things, or services are designated by specific brand or trade name in order to match other products in use on the particular public improvement either completed or in the course of completion:
--- Specification Section 283111 Digital, Addressable Fire-Alarm and Voice Evacuation System

The project estimate is between $14,000,000 and $15,000,000 for the initial 2 year term. Prequalification for this project has been waived. The District requires that Bidders possess any of the following classification(s) of California State Contractors License(s), valid and in good standing, at the time of bid opening and contract award: B.

All late bids shall be deemed non-responsive and not opened. Each bid shall be in accordance with all terms, conditions, plans, specifications and any other documents that comprise the bid package. The Bid and Contract Documents are available in three formats, hard copy, CD, or online from Plan Well. Hard copy bid documents are available at American Reprographics Company (ARC), 1200 4th Avenue (4th and B Street), San Diego, CA 92101, phone number 619-232-8440, for a refundable payment of Two Hundred Dollars ($200) per set; CD's are available for a non-refundable charge of $50. Payments shall be made by check payable to SAN DIEGO UNIFIED SCHOOL DISTRICT. If the payment for Bid and Contract Documents is refundable, refunds will be processed by the District only if the Bid and Contract Documents, including all addendums, are returned intact and in good order to ARC within ten (10) days of the issuance of the Final Bid Tabulation. Online documents are available for download free of charge on PlanWell through ARC. Go to www.crplanwell.com, click on Public Planroom (Questions? 714-434-8525). All bids shall be submitted on bid forms furnished by the District in the bid package beginning August 13, 2013. Bid packages will not be faxed.

As of January 1, 2012, the San Diego Unified School District no longer administers the in-house Labor Compliance Program for all new construction projects. Prevailing wage requirements will still apply to all public works projects and must be followed per Article 18 of the General Conditions of this bid.

WAGES: The Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in the locality in which this public work is to be performed for each craft, classification, or type of worker needed to execute the contract. Copies of that determination are available at the District's Labor Compliance Office for interested parties upon request; or may be found on the internet at: http://www.dir.ca.gov/DLSR/PWD. It shall be mandatory upon the contractor to whom this contract is awarded and upon any subcontractor under him to pay not less than the said specified rates to all laborers, workmen, and mechanics employed by them in the execution of the contract.

PROJECT STABILIZATION AGREEMENT (PSA): This project is subject to the Project Stabilization Agreement (PSA) adopted by the Board of Education on July 28, 2009. The complete agreement is available for viewing and downloading at www.sandi.net - Proposition S & Z. A special Project Stabilization Agreement (PSA) training workshop will be held in advance of this bid. The session will be held on August 20, 2013, from Noon to 2 PM at 4860 Ruffner Street, San Diego, CA 92111 in Training Room A. RSVP to Ivory Anderson at ianderson1@sandil.net or 858-539-9811.

DISABLED VETERAN BUSINESS ENTERPRISE PARTICIPATION PROGRAM: Pursuant to Resolution In Support of Service Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, the Bidder is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. In compliance with this Program, the Bidder shall satisfy all requirements enumerated in the bid package.

Each bid must be submitted on the Bid Form provided in the bid package and shall be accompanied by a satisfactory bid security in the form of either a bid bond executed by the bidder and Surety Company, or a certified or cashier's check in favor of the San Diego Unified School District, in an amount equal to ten percent (10%) of their bid value. Said bid security shall be given to guarantee that the Bidder will execute the contract as specified, within five (5) working days of notification by the District.

The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding. No bidder may withdraw his bid for a period of 120 days after the date set for the opening of bids. For information regarding bidding, please call 858-522-5825.

SAN DIEGO UNIFIED SCHOOL DISTRICT
Arthur S. Hanby, Jr., CPPO, C.P.M., CPPB, A.P.P
Strategic Sourcing and Contracts Officer
Strategic Sourcing and Contracts Dept
NO. CZ-14-0297-08
Advertised Dates: 08/13/13, 08/20/13 -00113270



SAN DIEGO UNIFIED SCHOOL DISTRICT
Advertisement for Bids
---

Notice is hereby given that the San Diego Unified School District, acting by and through its governing board, will receive sealed bids for the furnishing of all labor, materials, transportation, equipment, and services to:

FURNISH AND INSTALL HVAC SYSTEMS AND ALL ASSOCIATED WORK AT
DISTRICT SCHOOL SITES - REGION 2 (IDIQ)

A mandatory site visit is scheduled for 9:00 a.m. on AUGUST 22, 2013
outside the main office of Scripps Ranch High School, 10410 Treena Street, San Diego, CA 92131. Upon completion, contractors will proceed to Lewis Middle School, 5170 Greenbrier Avenue, San Diego, CA 92120. Upon completion, contractors will proceed to Marshall Elementary School, 3550 Altadena Avenue, San Diego, CA 92105. Contractors must be present at all 3 sites to be able to bid this project. PLEASE SEE BID FOR DETAILS. (No.CZ-14-0298-08)

All bids must be received at or before 1:00 p.m. on SEPTEMBER 13, 2013, at the Strategic Sourcing and Contracts Department, 2351 Cardinal Lane, Bldg. M, San Diego, CA 92123, at which time bids will be publicly opened and read aloud.

Under Public Contract Code 3400, the District has made a finding that the following particular materials, products, things, or services are designated by specific brand or trade name in order to match other products in use on the particular public improvement either completed or in the course of completion:
--- Specification Section 283111 Digital, Addressable Fire-Alarm and Voice Evacuation System

The project estimate is between $21,000,000 and $22,000,000 for the initial 2 year term. Prequalification for this project has been waived. The District requires that Bidders possess any of the following classification(s) of California State Contractors License(s), valid and in good standing, at the time of bid opening and contract award: B.

All late bids shall be deemed non-responsive and not opened. Each bid shall be in accordance with all terms, conditions, plans, specifications and any other documents that comprise the bid package. The Bid and Contract Documents are available in three formats, hard copy, CD, or online from Plan Well. Hard copy bid documents are available at American Reprographics Company (ARC), 1200 4th Avenue (4th and B Street), San Diego, CA 92101, phone number 619-232-8440, for a refundable payment of Two Hundred Dollars ($200) per set; CD's are available for a non-refundable charge of $50. Payments shall be made by check payable to SAN DIEGO UNIFIED SCHOOL DISTRICT. If the payment for Bid and Contract Documents is refundable, refunds will be processed by the District only if the Bid and Contract Documents, including all addendums, are returned intact and in good order to ARC within ten (10) days of the issuance of the Final Bid Tabulation. Online documents are available for download free of charge on PlanWell through ARC. Go to www.crplanwell.com, click on Public Planroom (Questions? 714-434-8525). All bids shall be submitted on bid forms furnished by the District in the bid package beginning August 13, 2013. Bid packages will not be faxed.

As of January 1, 2012, the San Diego Unified School District no longer administers the in-house Labor Compliance Program for all new construction projects. Prevailing wage requirements will still apply to all public works projects and must be followed per Article 18 of the General Conditions of this bid.

WAGES: The Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in the locality in which this public work is to be performed for each craft, classification, or type of worker needed to execute the contract. Copies of that determination are available at the District's Labor Compliance Office for interested parties upon request; or may be found on the internet at: http://www.dir.ca.gov/DLSR/PWD. It shall be mandatory upon the contractor to whom this contract is awarded and upon any subcontractor under him to pay not less than the said specified rates to all laborers, workmen, and mechanics employed by them in the execution of the contract.

PROJECT STABILIZATION AGREEMENT (PSA): This project is subject to the Project Stabilization Agreement (PSA) adopted by the Board of Education on July 28, 2009. The complete agreement is available for viewing and downloading at www.sandi.net - Proposition S & Z. A special Project Stabilization Agreement (PSA) training workshop will be held in advance of this bid. The session will be held on August 20, 2013, from Noon to 2 PM at 4860 Ruffner Street, San Diego, CA 92111 in Training Room A. RSVP to Ivory Anderson at ianderson1@sandil.net or 858-539-9811.

DISABLED VETERAN BUSINESS ENTERPRISE PARTICIPATION PROGRAM: Pursuant to Resolution In Support of Service Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, the Bidder is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. In compliance with this Program, the Bidder shall satisfy all requirements enumerated in the bid package.

Each bid must be submitted on the Bid Form provided in the bid package and shall be accompanied by a satisfactory bid security in the form of either a bid bond executed by the bidder and Surety Company, or a certified or cashier's check in favor of the San Diego Unified School District, in an amount equal to ten percent (10%) of their bid value. Said bid security shall be given to guarantee that the Bidder will execute the contract as specified, within five (5) working days of notification by the District.

The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding. No bidder may withdraw his bid for a period of 120 days after the date set for the opening of bids. For information regarding bidding, please call 858-522-5825.

SAN DIEGO UNIFIED SCHOOL DISTRICT
Arthur S. Hanby, Jr., CPPO, C.P.M., CPPB, A.P.P
Strategic Sourcing and Contracts Officer
Strategic Sourcing and Contracts Dept
NO. CZ-14-0298-08
Advertised Dates: 08/13/13, 08/20/13 -00113273



SAN DIEGO UNIFIED SCHOOL DISTRICT
Advertisement for Bids
---

Notice is hereby given that the San Diego Unified School District, acting by and through its governing board, will receive sealed bids for the furnishing of all labor, materials, transportation, equipment, and services to:

FURNISH AND INSTALL HVAC SYSTEMS AND ALL ASSOCIATED WORK AT
DISTRICT SCHOOL SITES - REGION 3 (IDIQ)

A mandatory site visit is scheduled for 9:00 a.m. on AUGUST 22, 2013
outside the main office of Scripps Ranch High School, 10410 Treena Street, San Diego, CA 92131. Upon completion, contractors will proceed to Lewis Middle School, 5170 Greenbrier Avenue, San Diego, CA 92120. Upon completion, contractors will proceed to Marshall Elementary School, 3550 Altadena Avenue, San Diego, CA 92105. Contractors must be present at all 3 sites to be able to bid this project. PLEASE SEE BID FOR DETAILS. (No.CZ-14-0299-08)

All bids must be received at or before 1:00 p.m. on SEPTEMBER 18, 2013, at the Strategic Sourcing and Contracts Department, 2351 Cardinal Lane, Bldg. M, San Diego, CA 92123, at which time bids will be publicly opened and read aloud.

Under Public Contract Code 3400, the District has made a finding that the following particular materials, products, things, or services are designated by specific brand or trade name in order to match other products in use on the particular public improvement either completed or in the course of completion:
--- Specification Section 283111 Digital, Addressable Fire-Alarm and Voice Evacuation System

The project estimate is between $18,000,000 and $19,000,000 for the initial 2 year term. Prequalification for this project has been waived. The District requires that Bidders possess any of the following classification(s) of California State Contractors License(s), valid and in good standing, at the time of bid opening and contract award: B.

All late bids shall be deemed non-responsive and not opened. Each bid shall be in accordance with all terms, conditions, plans, specifications and any other documents that comprise the bid package. The Bid and Contract Documents are available in three formats, hard copy, CD, or online from Plan Well. Hard copy bid documents are available at American Reprographics Company (ARC), 1200 4th Avenue (4th and B Street), San Diego, CA 92101, phone number 619-232-8440, for a refundable payment of Two Hundred Dollars ($200) per set; CD's are available for a non-refundable charge of $50. Payments shall be made by check payable to SAN DIEGO UNIFIED SCHOOL DISTRICT. If the payment for Bid and Contract Documents is refundable, refunds will be processed by the District only if the Bid and Contract Documents, including all addendums, are returned intact and in good order to ARC within ten (10) days of the issuance of the Final Bid Tabulation. Online documents are available for download free of charge on PlanWell through ARC. Go to www.crplanwell.com, click on Public Planroom (Questions? 714-434-8525). All bids shall be submitted on bid forms furnished by the District in the bid package beginning August 13, 2013. Bid packages will not be faxed.

As of January 1, 2012, the San Diego Unified School District no longer administers the in-house Labor Compliance Program for all new construction projects. Prevailing wage requirements will still apply to all public works projects and must be followed per Article 18 of the General Conditions of this bid.

WAGES: The Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in the locality in which this public work is to be performed for each craft, classification, or type of worker needed to execute the contract. Copies of that determination are available at the District's Labor Compliance Office for interested parties upon request; or may be found on the internet at: http://www.dir.ca.gov/DLSR/PWD. It shall be mandatory upon the contractor to whom this contract is awarded and upon any subcontractor under him to pay not less than the said specified rates to all laborers, workmen, and mechanics employed by them in the execution of the contract.

PROJECT STABILIZATION AGREEMENT (PSA): This project is subject to the Project Stabilization Agreement (PSA) adopted by the Board of Education on July 28, 2009. The complete agreement is available for viewing and downloading at www.sandi.net - Proposition S & Z. A special Project Stabilization Agreement (PSA) training workshop will be held in advance of this bid. The session will be held on August 20, 2013, from Noon to 2 PM at 4860 Ruffner Street, San Diego, CA 92111 in Training Room A. RSVP to Ivory Anderson at ianderson1@sandil.net or 858-539-9811.

DISABLED VETERAN BUSINESS ENTERPRISE PARTICIPATION PROGRAM: Pursuant to Resolution In Support of Service Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, the Bidder is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. In compliance with this Program, the Bidder shall satisfy all requirements enumerated in the bid package.

Each bid must be submitted on the Bid Form provided in the bid package and shall be accompanied by a satisfactory bid security in the form of either a bid bond executed by the bidder and Surety Company, or a certified or cashier's check in favor of the San Diego Unified School District, in an amount equal to ten percent (10%) of their bid value. Said bid security shall be given to guarantee that the Bidder will execute the contract as specified, within five (5) working days of notification by the District.

The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding. No bidder may withdraw his bid for a period of 120 days after the date set for the opening of bids. For information regarding bidding, please call 858-522-5825.

SAN DIEGO UNIFIED SCHOOL DISTRICT
0Arthur S. Hanby, Jr., CPPO, C.P.M., CPPB, A.P.P
Strategic Sourcing and Contracts Officer
Strategic Sourcing and Contracts Dept
NO. CZ-14-0299-08
Advertised Dates: 08/13/13, 08/20/13 -00113274


SAN DIEGO UNIFIED SCHOOL DISTRICT
Advertisement for Bids
---

Notice is hereby given that the San Diego Unified School District, acting by and through its governing board, will receive sealed bids for the furnishing of all labor, materials, transportation, equipment, and services to:

FURNISH AND INSTALL HVAC SYSTEMS AND ALL ASSOCIATED WORK AT
DISTRICT SCHOOL SITES - REGION 4 (IDIQ)

A mandatory site visit is scheduled for 9:00 a.m. on AUGUST 15, 2013
outside the main office of Valencia Park Elementary School, 5880 Skyline Drive, San Diego, CA 92114. Upon completion, contractors will proceed to Bethune Elementary School, 6835 Benjamin Holt Road, San Diego, CA 92114. Contractors must be present at both sites to be able to bid this project. PLEASE SEE BID FOR DETAILS. (No.CZ-14-0300-08)

All bids must be received at or before 1:00 p.m. on AUGUST 30, 2013, at the Strategic Sourcing and Contracts Department, 2351 Cardinal Lane, Bldg. M, San Diego, CA 92123, at which time bids will be publicly opened and read aloud.

Under Public Contract Code 3400, the District has made a finding that the following particular materials, products, things, or services are designated by specific brand or trade name in order to match other products in use on the particular public improvement either completed or in the course of completion:
--- Specification Section 283111 Digital, Addressable Fire-Alarm and Voice Evacuation System

The project estimate is between $15,000,000 and $16,000,000 for the initial 2 year term. Prequalification for this project has been waived. The District requires that Bidders possess any of the following classification(s) of California State Contractors License(s), valid and in good standing, at the time of bid opening and contract award: B.

All late bids shall be deemed non-responsive and not opened. Each bid shall be in accordance with all terms, conditions, plans, specifications and any other documents that comprise the bid package. The Bid and Contract Documents are available in three formats, hard copy, CD, or online from Plan Well. Hard copy bid documents are available at American Reprographics Company (ARC), 1200 4th Avenue (4th and B Street), San Diego, CA 92101, phone number 619-232-8440, for a refundable payment of Two Hundred Dollars ($200) per set; CD's are available for a non-refundable charge of $50. Payments shall be made by check payable to SAN DIEGO UNIFIED SCHOOL DISTRICT. If the payment for Bid and Contract Documents is refundable, refunds will be processed by the District only if the Bid and Contract Documents, including all addendums, are returned intact and in good order to ARC within ten (10) days of the issuance of the Final Bid Tabulation. Online documents are available for download free of charge on PlanWell through ARC. Go to www.crplanwell.com, click on Public Planroom (Questions? 714-434-8525). All bids shall be submitted on bid forms furnished by the District in the bid package beginning August 6, 2013. Bid packages will not be faxed.

As of January 1, 2012, the San Diego Unified School District no longer administers the in-house Labor Compliance Program for all new construction projects. Prevailing wage requirements will still apply to all public works projects and must be followed per Article 18 of the General Conditions of this bid.

WAGES: The Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in the locality in which this public work is to be performed for each craft, classification, or type of worker needed to execute the contract. Copies of that determination are available at the District's Labor Compliance Office for interested parties upon request; or may be found on the internet at: http://www.dir.ca.gov/DLSR/PWD. It shall be mandatory upon the contractor to whom this contract is awarded and upon any subcontractor under him to pay not less than the said specified rates to all laborers, workmen, and mechanics employed by them in the execution of the contract.

PROJECT STABILIZATION AGREEMENT (PSA): This project is subject to the Project Stabilization Agreement (PSA) adopted by the Board of Education on July 28, 2009. The complete agreement is available for viewing and downloading at www.sandi.net - Proposition S & Z. A special Project Stabilization Agreement (PSA) training workshop will be held in advance of this bid. The session will be held on August 20, 2013, from Noon to 2 PM at 4860 Ruffner Street, San Diego, CA 92111 in Training Room A. RSVP to Ivory Anderson at ianderson1@sandil.net or 858-539-9811.

DISABLED VETERAN BUSINESS ENTERPRISE PARTICIPATION PROGRAM: Pursuant to Resolution In Support of Service Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, the Bidder is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. In compliance with this Program, the Bidder shall satisfy all requirements enumerated in the bid package.

Each bid must be submitted on the Bid Form provided in the bid package and shall be accompanied by a satisfactory bid security in the form of either a bid bond executed by the bidder and Surety Company, or a certified or cashier's check in favor of the San Diego Unified School District, in an amount equal to ten percent (10%) of their bid value. Said bid security shall be given to guarantee that the Bidder will execute the contract as specified, within five (5) working days of notification by the District.

The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding. No bidder may withdraw his bid for a period of 120 days after the date set for the opening of bids. For information regarding bidding, please call 858-522-5831.

SAN DIEGO UNIFIED SCHOOL DISTRICT
Arthur S. Hanby, Jr., CPPO, C.P.M., CPPB, A.P.P
Strategic Sourcing and Contracts Officer
Strategic Sourcing and Contracts Dept
NO. CZ-14-0300-08
Advertised Dates: 08/06/13, 08/13/13 -00113067


SAN DIEGO UNIFIED SCHOOL DISTRICT
Advertisement for Bids
---

Notice is hereby given that the San Diego Unified School District, acting by and through its governing board, will receive sealed bids for the furnishing of all labor, materials, transportation, equipment, and services to:

FURNISH AND INSTALL HVAC SYSTEMS AND ALL ASSOCIATED WORK AT
DISTRICT SCHOOL SITES - REGION 5 (IDIQ)

A mandatory site visit is scheduled for 9:00 a.m. on AUGUST 15, 2013
outside the main office of Valencia Park Elementary School, 5880 Skyline Drive, San Diego, CA 92114. Upon completion, contractors will proceed to Bethune Elementary School, 6835 Benjamin Holt Road, San Diego, CA 92114. Contractors must be present at both sites to be able to bid this project. PLEASE SEE BID FOR DETAILS. (No.CZ-14-0301-08)

All bids must be received at or before 1:00 p.m. on AUGUST 29, 2013, at the Strategic Sourcing and Contracts Department, 2351 Cardinal Lane, Bldg. M, San Diego, CA 92123, at which time bids will be publicly opened and read aloud.

Under Public Contract Code 3400, the District has made a finding that the following particular materials, products, things, or services are designated by specific brand or trade name in order to match other products in use on the particular public improvement either completed or in the course of completion:
--- Specification Section 283111 Digital, Addressable Fire-Alarm and Voice Evacuation System

The project estimate is between $21,000,000 and $22,000,000 for the initial 2 year term. Prequalification for this project has been waived. The District requires that Bidders possess any of the following classification(s) of California State Contractors License(s), valid and in good standing, at the time of bid opening and contract award: B.

All late bids shall be deemed non-responsive and not opened. Each bid shall be in accordance with all terms, conditions, plans, specifications and any other documents that comprise the bid package. The Bid and Contract Documents are available in three formats, hard copy, CD, or online from Plan Well. Hard copy bid documents are available at American Reprographics Company (ARC), 1200 4th Avenue (4th and B Street), San Diego, CA 92101, phone number 619-232-8440, for a refundable payment of Two Hundred Dollars ($200) per set; CD's are available for a non-refundable charge of $50. Payments shall be made by check payable to SAN DIEGO UNIFIED SCHOOL DISTRICT. If the payment for Bid and Contract Documents is refundable, refunds will be processed by the District only if the Bid and Contract Documents, including all addendums, are returned intact and in good order to ARC within ten (10) days of the issuance of the Final Bid Tabulation. Online documents are available for download free of charge on PlanWell through ARC. Go to www.crplanwell.com, click on Public Planroom (Questions? 714-434-8525). All bids shall be submitted on bid forms furnished by the District in the bid package beginning August 6, 2013. Bid packages will not be faxed.

As of January 1, 2012, the San Diego Unified School District no longer administers the in-house Labor Compliance Program for all new construction projects. Prevailing wage requirements will still apply to all public works projects and must be followed per Article 18 of the General Conditions of this bid.

WAGES: The Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in the locality in which this public work is to be performed for each craft, classification, or type of worker needed to execute the contract. Copies of that determination are available at the District's Labor Compliance Office for interested parties upon request; or may be found on the internet at: http://www.dir.ca.gov/DLSR/PWD. It shall be mandatory upon the contractor to whom this contract is awarded and upon any subcontractor under him to pay not less than the said specified rates to all laborers, workmen, and mechanics employed by them in the execution of the contract.

PROJECT STABILIZATION AGREEMENT (PSA): This project is subject to the Project Stabilization Agreement (PSA) adopted by the Board of Education on July 28, 2009. The complete agreement is available for viewing and downloading at www.sandi.net - Proposition S & Z. A special Project Stabilization Agreement (PSA) training workshop will be held in advance of this bid. The session will be held on August 20, 2013, from Noon to 2 PM at 4860 Ruffner Street, San Diego, CA 92111 in Training Room A. RSVP to Ivory Anderson at ianderson1@sandil.net or 858-539-9811.

DISABLED VETERAN BUSINESS ENTERPRISE PARTICIPATION PROGRAM: Pursuant to Resolution In Support of Service Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, the Bidder is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. In compliance with this Program, the Bidder shall satisfy all requirements enumerated in the bid package.

Each bid must be submitted on the Bid Form provided in the bid package and shall be accompanied by a satisfactory bid security in the form of either a bid bond executed by the bidder and Surety Company, or a certified or cashier's check in favor of the San Diego Unified School District, in an amount equal to ten percent (10%) of their bid value. Said bid security shall be given to guarantee that the Bidder will execute the contract as specified, within five (5) working days of notification by the District.

The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding. No bidder may withdraw his bid for a period of 120 days after the date set for the opening of bids. For information regarding bidding, please call 858-522-5831.

SAN DIEGO UNIFIED SCHOOL DISTRICT
Arthur S. Hanby, Jr., CPPO, C.P.M., CPPB, A.P.P
Strategic Sourcing and Contracts Officer
Strategic Sourcing and Contracts Dept
NO. CZ-14-0301-08
Advertised Dates: 08/06/13, 08/13/13 -00113068


SAN DIEGO UNIFIED SCHOOL
DISTRICT
NOTICE TO ALL CONTRACTORS WISHING TO BID ON SAN DIEGO UNIFIED SCHOOL DISTRICT CONSTRUCTION PROJECTS ESTIMATED AT ONE MILLION DOLLARS ($1,000,000) OR OVER
---
Pursuant to California Public Contract Code 201111.6, for all construction contracts awarded as of January 1, 2014, San Diego Unified School District is soliciting prequalification questionnaires from any and all general contractors or subcontractors wishing to submit bids to the District or to a bidding prime contractor. Specifically, all A and B licensed general contractors and all mechanical, electrical and plumbing licensed specialty contractors holding the classifications of C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 and C-46 must be prequalified in order to bid on any District construction project estimated at $1,000,000 or more.

All prequalification questionnaires must be verified under oath, are not public documents and shall not be open to public inspection.

For contractors wishing to prequalify for a particular project, their completed prequalification questionnaire must be submitted no later than ten (10) days prior to bid opening due date. Questionnaires submitted after the ten day deadline will not be processed. For all timely submittals, District will respond no later than five (5) days prior to bid opening due date with notice of qualification or disqualification to the submitting contractor.

Qualification shall be valid for one year from date of initial qualification. Contractors are required to submit a new questionnaire annually at least sixty (60) days prior to the anniversary date of their initial qualification.

To obtain a prequalification package, please email Judi Stark, Construction Contracts Assistant at jstark@sandi.net.

SAN DIEGO UNIFIED SCHOOL DISTRICT
Arthur S. Hanby, Jr., CPPO, C.P.M., CPPB, A.P.P
Strategic Sourcing and Contracts Officer
Strategic Sourcing and Contracts Dept
Pub Aug 6, 13, 20, 27, Sep 3, 10, 17, 24, Oct 7, Nov 4, Dec 2, Jan 6, Feb 3, Mar 3 -00113065