City of San Diego
PUBLISHED: Thursday September 19, 2013

CITY OF SAN DIEGO
NOTICE TO BIDDERS
---

NOTICE IS HEREBY GIVEN that the City of San Diego will receive bids for work at the Public Works Department, Public Works Contracting Group, 1010 Second Avenue, Suite 1400, San Diego, California, where bids are to be submitted prior to time specified. Plans and specifications can be obtained from The City of San Diego's website: http://www.sandiego.gov/bids-contracts. A pre-bid meeting and/or pre-bid visit to the work site will be held, if indicated, at the time and place specified in the contract documents. Prospective bidders are encouraged to attend these sessions.
It is the policy of the City of San Diego to encourage equal opportunity in its construction, consultant, material and supply contracts. Bids/proposals from small businesses, minority-owned, disabled, veteran-owned businesses, women-owned businesses and local firms are strongly encouraged. Contractors are encouraged to subcontract and/or participate in joint ventures with these firms. The City is committed to equal opportunity and will not discriminate with regard to race, religion, color, ancestry, age, gender, disability, medical condition or place of birth and will not do business with any firm that discriminates on any basis.
Contractors interested in bidding projects over $50,000 must be pre-qualified. Please contact DAVE STUCKY of the City's Pre-Qualification Program at (619) 533-3474 or dstucky@sandiego.gov to obtain an application.
Sign language or oral interpreting services are available at pre-bid meetings and bid openings with a 5 business day notice to the Contracting Division at (619) 533-3450.
1. NORTH TORREY PINES ROADWAY & MEDIAN ENHANCEMENTS
Bid No. K-14-5606-DBB-3. WBS NO. S-00868. Pre-Bid Date: October 3, 2013
@ 10:00 a.m. Pre-Bid Location: Conference Room, 14th Floor, 1010 Second Avenue, Suite 1400, San Diego, CA 92101. Bid Opening Date: October 23, 2013 @ 2:00 p.m. Construction Estimate: $1,862,000. License Requirement: A.
THE CITY'S SUBCONTRACTING PARTICIPATION REQUIREMENTS FOR SLBE PROGRAM.
PREVAILING WAGE RATES: STATE
Al Rechany
Public Works Contracting Group
September 19, 2013
Pub Sep 19 -00114346

CITY OF SAN DIEGO
NOTICE TO BIDDERS
---

NOTICE IS HEREBY GIVEN that the City of San Diego will receive bids for work at the Public Works Department, Public Works Contracting Group, 1010 Second Avenue, Suite 1400, San Diego, California, where bids are to be submitted prior to time specified. Plans and specifications can be obtained from The City of San Diego's website: http://www.sandiego.gov/bids-contracts. A pre-bid meeting and/or pre-bid visit to the work site will be held, if indicated, at the time and place specified in the contract documents. Prospective bidders are encouraged to attend these sessions.
It is the policy of the City of San Diego to encourage equal opportunity in its construction, consultant, material and supply contracts. Bids/proposals from small businesses, minority-owned, disabled, veteran-owned businesses, women-owned businesses and local firms are strongly encouraged. Contractors are encouraged to subcontract and/or participate in joint ventures with these firms. The City is committed to equal opportunity and will not discriminate with regard to race, religion, color, ancestry, age, gender, disability, medical condition or place of birth and will not do business with any firm that discriminates on any basis.
Contractors interested in bidding projects over $50,000 must be pre-qualified. Please contact DAVE STUCKY of the City's Pre-Qualification Program at (619) 533-3474 or dstucky@sandiego.gov to obtain an application.
Sign language or oral interpreting services are available at pre-bid meetings and bid openings with a 5 business day notice to the Contracting Division at (619) 533-3450.
1. WATER GROUP JOB 961
Bid No. K-14-6019-DBB-3. WBS NO. B-12051. Pre-Bid Date: September 25, 2013 @ 10:00 a.m. Pre-Bid Location: Conference Room, 14th Floor, 1010 Second Avenue, Suite 1400, San Diego, CA 92101. Bid Opening Date: October 22, 2013 @ 2:00 p.m. Construction Estimate: $1,313,000. License Requirement: A or C34.
THE CITY'S SUBCONTRACTING PARTICIPATION REQUIREMENTS FOR SLBE PROGRAM.
PREVAILING WAGE RATES: STATE
Al Rechany
Public Works Contracting Group
September 19, 2013
Pub Sep 19 -00114387

CITY OF SAN DIEGO
TRANSPORTATION & STORM WATER DEPARTMENT
REQUEST FOR PROPOSAL
FOR

UTILITIES UNDERGROUNDING PROGRAM MASTER PLAN (H146088)
---

The City of San Diego (City) is requesting proposals from highly qualified civil engineering firms for consultant services for Utilities Undergrounding Program Master Plan (H146088).

It is the policy of the City to provide equal opportunity in its civil engineering professional services contracts. Toward this end, proposals from small local businesses, disadvantaged businesses and disabled veteran, women and minority owned businesses are strongly encouraged. Prime consultants are encouraged to provide subconsultant opportunities or joint venture with these firms. The City endeavors to do business with firms sharing the City's commitment to equal opportunity and will not do business with any firm that discriminates on the basis of race, religion, color, ancestry, age, gender, sexual orientation, disability, medical condition or place of birth.

This project has a voluntary Small Local Business Enterprises (SLBE) / Emerging Local Business Enterprises (ELBE) Participation Level (SLBE/ELBE) goal of 20%. SLBE/ELBE goals are achieved by contracting with SLBE and ELBE firms as defined in the following website, http://www.sandiego.gov/eoc/boc/slbe.shtml. Attainment of the SLBE/ELBE goal is strongly encouraged, but strictly voluntary.

The City of San Diego will ensure that full access to programs, services, meetings and activities comply with Section 504, Title V, of the Rehabilitation Act and Americans with Disabilities Act (ADA) 1990, Public Law 101-336.

In-depth knowledge and a strong understanding of the local environment, and a local presence for interfacing with the City's project management staff are essential to the successful completion of this project. The proposal must address the consultant's knowledge and understanding of: the City and other local agencies' regulations and policies; local environment; and local building codes and other criteria. The proposal must also address how the consultant plans to interface with the City's project management staff and the consultant's workforce in San Diego County.

The Request for Proposal (PDF) and the Standard Electronic Forms (Word Template.dot) may be downloaded from the following Ebidboard website:

http://www.ebidboard.com/public/rfps/index.asp?mbrguid=ED2999CE-C4AB-427D-AB03-EEB90B5A7688

It is important to register at this website to become an official RFP holder. You must be a registered RFP holder to receive addenda. A pass/fail requirement, at Section 6.2.10 of the RFP, requires acknowledgement of all addenda in proposals. For assistance, phone or email John Mendivil at 619-533-3638 or jmendivil@sandiego.gov.

A pre-proposal meeting will be held on Wednesday, October 2, 2013, 9:00:00 AM, at Executive Complex, 14th Floor Large Conference Room, 1010 Second Avenue, San Diego, CA 92101. It is strongly recommended that all interested parties attend. For more information, assistance, to request an agenda in alternative format, or to request a sign language or oral interpreter for the meeting, please contact Mario Reyes, at 619-533-7426 at least five working days prior to the meeting to ensure availability.

Proposals are due no later than 5:00 p.m. Friday, October 25, 2013, at the location stated in the RFP. This RFP does not commit the City to award a contract or to defray any costs incurred in the preparation of a proposal pursuant to this RFP. The City reserves the right to accept or reject any or all proposals received as a result of this RFP. The City also reserves the right to revise this RFP, including but not limited to the pre-proposal meeting date and the proposal due date. If the City revises the RFP, all RFP holders of record will be notified in writing by the City.

SUMMARY SCOPE OF SERVICES

The City of San Diego (City) has a need for professional engineering consultant services to develop a system-wide Utility Undergrounding Program master plan. The scope of services includes assessment of over eleven hundred miles of overhead SDG&E distribution lines, and approximately fifty-five miles of SDG&E 69KV transmission lines. The Consultant shall create criteria in order to prioritize undergrounding blocks. Criteria are to be created in order to underground existing overhead lines in the most cost efficient manner. Consultant shall create criteria for distribution and transmission, to provide the flexibility to underground each system separately. The remainder of the Scope of Services is contained in the Request for Proposal for Utilities Undergrounding Program Master Plan (H146088), as Exhibit A to the Draft Agreement.
Pub Sep 19 -00114343


CITY OF SAN DIEGO
DATE OF NOTICE: September 19, 2013

NOTICE OF PUBLIC HEARING
PLANNING COMMISSION
---
DATE OF HEARING:
October 3, 2013
TIME OF HEARING:
9:00 A.M.
LOCATION OF HEARING:
Council Chambers, 12th Floor, City Administration Building, 202 C Street, San Diego, California 92101

PROJECT TYPE:
COASTAL DEVELOPMENT PERMIT AND PLANNED DEVELOPMENT PERMIT. PROCESS FOUR; EXEMPT FROM ENVIRONMENTAL
PROJECT NUMBER:
227059
PROJECT NAME:
POINT LOMA AVENUE MIXED USE
APPLICANT:
Bahram Ghadishah

COMMUNITY PLAN AREA:
Ocean Beach
COUNCIL DISTRICT:
District 1

CITY PROJECT MANAGER:
SANDRA TEASLEY, Development Project Manager
PHONE NUMBER/E-MAIL: (619) 446-5271, steasley@sandiego.gov
As a property owner, tenant or person who has requested notice, you should know that the Planning Commission will hold a public hearing to approve, conditionally approve, or deny an application for a Coastal Development Permit and a Planned Development Permit to construct a two-story, 3,521-square-foot, mixed use building consisting of commercial lease space and parking on the first floor, and one 2-bedroom apartment unit on the second floor. The proposed development includes a deviation as allowed with a Planned Development Permit to provide two parking spaces within a tandem parking space (garage) where the site is not located within the Residential Tandem Parking Overlay Zone. The 2,500-square-foot, vacant site is located at 4741 Point Loma Avenue in the CC-2-4 Zone, and Coastal Overlay Zone (non-appealable area), within the Ocean Beach Community Planning area and Council District 2. This application was filed on December 22, 2010.
The decision of the Planning Commission is final unless the project is appealed to the City Council. In order to appeal the decision of the Planning Commission you must be present at the public hearing and file a speaker slip concerning the application or have expressed interest by writing to the Planning Commission before the close of the public hearing. Please do not e-mail appeals as they will not be accepted. See Information Bulletin 505 “Appeal Procedure”, available at www.sandiego.gov/development-services or in person at the office of the City Clerk, 202 "C" Street, Second Floor. The appeal must be made within 10 working days of the Planning Commission decision. If you wish to challenge the City's action on the above proceedings in court, you may be limited to addressing only those issues you or someone else have raised at the public hearing described in this notice, or written in correspondence to the City at or before the public hearing.
This project was determined to be categorically exempt from the California Environmental Quality Act on July 16, 2013 and the opportunity to appeal that determination ended July 30, 2013.
The final decision by the City of San Diego is not appealable to the California Coastal Commission. If you want to receive a Notice of Final Action, you must submit a written request to the City Project Manager listed above.
If you have any questions after reviewing this information, you can contact the City Project Manager listed above.
This information will be made available in alternative formats upon request. To request an agenda in alternative format or to request a sign language or oral interpreter for the meeting, call Support Services at (619) 321-3208 at least five working days prior to the meeting to insure availability. Assistive Listening Devices (ALD's) are also available for the meeting upon request.
Internal Order Number: 24001405
Pub Sep 19 -00114136


CITY OF SAN DIEGO
DATE OF NOTICE: September 19, 2013

NOTICE OF PUBLIC HEARING
PLANNING COMMISSION
RECOMMENDATION
---
DATE OF HEARING:
October 3, 2013
TIME OF HEARING:
9:00 A.M.
LOCATION OF HEARING:
Council Chambers, 12th Floor, City Administration Building, 202 C Street, San Diego, California 92101

PROJECT TYPE:
Community Plan Amendment, Conditional Use Permit, Addendum to EIR Nos. 95-0173 and 96-7902 & Addendums Nos. 95-0173.1/99-1161
PROJECT NUMBER:
257983
PROJECT NAME:
SANTALUZ ASSISTED LIVING
APPLICANT:
Joe Taylor

COMMUNITY PLAN AREA:
Black Mountain Ranch Subarea Plan
COUNCIL DISTRICT:
District 5

CITY PROJECT MANAGER:
William Zounes, Development Project Manager
PHONE NUMBER/E-MAIL: (619) 687-5942/wzounes@sandiego.gov
As a property owner, tenant or person who has requested notice, you should know that the Planning Commission will hold a public hearing to recommend approval, conditional approval, or denial to the City Council for a nursing facility for assisted living and memory care residence on a vacant 3.28-acre site located at 14740 Via Fiesta in the AR-1-1 Zone within the Black Mountain Ranch Community Plan. The facility would consist of 64 assisted living and memory care units with 74 beds and 24 hour staffing. The project requires a Community Plan Amendment to re-designate the site from Institutional-Recreation Center and Institutional-Senior Center to Institutional-Nursing Facility and a Conditional Use Permit to regulate the facility.
The decision to approve, conditionally approve, modify or deny the Community Plan Amendment and Conditional Use Permit will be made by the City Council at a future public hearing. You will also receive a notice of the City Council public hearing.
Addendum No. 257983 (Addendum to EIR No. 95-0173 and 96-7902 & Addendums Nos. 95-0173.1/99-1161) was prepared to address the projects consistency with all applicable previously certified documents and incorporates monitoring requirements for paleontological resources consistent with those documents.
If you have any questions after reviewing this information, you can contact the City Project Manager listed above.
This information will be made available in alternative formats upon request. To request an agenda in alternative format or to request a sign language or oral interpreter for the meeting, call Support Services at (619) 321-3208 at least five working days prior to the meeting to insure availability. Assistive Listening Devices (ALD's) are also available for the meeting upon request.
Internal Order Number: 24002281
Pub Sep 19 -00114062








CITY OF SAN DIEGO

DATE OF NOTICE: September 19, 2013

NOTICE OF APPLICATION
DEVELOPMENT SERVICES DEPARTMENT
---
As a property owner, tenant, or person who has requested notice, you should know that an application has been filed with the City of San Diego for a (Process 4) Conditional Use Permit application for a new Wireless Communication Facility located at 3866 Ingraham Street in the RM-3-7 zone of the Pacific Beach Community Plan. The project consists of twelve (12) antennas behind the existing rooftop mechanical screen wall. The equipment associated with this project is located in the basement, not visible to the public. Coastal Height Limit Overlay Zone, Council District 2. This application was filed on September 5, 2013.


PROJECT NUMBER: 326246
PROJECT NAME: AT&T MOBILITY CROWN POINTE
CONTACT NAME: Tim Henion
COMMUNITY PLAN AREA: Pacific Beach

CITY PROJECT MANAGER: Simon Tse
MANAGER PHONE NUMBER/E-MAIL: (619) 687-5984 / Stse@sandiego.gov



The decision to approve or deny this application will be made at a public hearing. You will receive another notice informing you of the date, time, and location of the public hearing. In addition, this item will be discussed by the Community Planning Group for the area in which the project is located. They will make an advisory recommendation to the City of San Diego.

You may contact Brian Curry of the Pacific Beach Planning Group (619) 542-1188 to inquire about the community planning group meeting dates, times, and location for community review of this project.

If you have any questions regarding this application after reviewing this information, you may contact the City of San Diego Project Manager listed above.

This information will be made available in alternative formats upon request.

Internal Order No.: 24003813
Pub Sep 19 -00114135

CITY OF SAN DIEGO
DATE OF NOTICE: September 18, 2013
NOTICE OF PUBLIC HEARING
TUESDAY, OCTOBER 1, 2013 at 10:00AM
---
NOTICE IS HEREBY GIVEN THAT THE COUNCIL OF THE CITY OF SAN DIEGO WILL CONSIDER THE ADOPTION OF ORDINANCE NO. O-2014-22, PURSUANT TO SECTION 99 OF THE CHARTER OF THE CITY OF SAN DIEGO, TO EXECUTE AN AGREEMENT RICK ENGINEERING COMPANY FOR THE DESIGN PROFESSIONAL FOR THE PACIFIC BEACH PIPELINE SOUTH AND CALTRANS PACIFIC BEACH PIPELINE CENTRAL (H135881). FOR ADDITIONAL INFORMATION; (Wendy Gamboa, 619-235-1971/Jing DeBeliso, 619-533-5285)

CONSIDERATION OF THE ORDINANCE WILL TAKE PLACE AT THE REGULAR CITY COUNCIL MEETING ON TUESDAY, OCTOBER 1, 2013 IN THE CITY ADMINISTRATION BUILDING, COUNCIL CHAMBERS, 12TH FLOOR, 202 C STREET, SAN DIEGO, CA 92101 AT 10:00 AM. OR AS SOON THEREAFTER AS BUSINESS ALLOWS.

A COMPLETE COPY OF ORDINANCE O-2014-22 IS AVAILABLE FOR INSPECTION IN THE OFFICE OF THE CITY CLERK OF THE CITY OF SAN DIEGO, CITY ADMINISTRATION BUILDING, 202 C STREET, 2ND FLOOR, SAN DIEGO, CA 92101.

This material is available in alternative formats upon request. To order information in an alternative format, or to arrange for a sign language or oral interpreter for the meeting, please call the Clerk's office at least 5 working days prior to the meeting at 533-4000 (voice) or 236-7012 (TT).
ELIZABETH MALAND
SAN DIEGO CITY CLERK
Pub Sep 19-00114399

CITY OF SAN DIEGO
NOTICE TO BIDDERS
---
NOTICE IS HEREBY GIVEN, that the City of San Diego will receive bids for commodities and services. Bid packages can be downloaded from the City of San Diego’s Bid & Contract Opportunities web page, found at http://www.sandiego.gov under the Business section.
If you are unable to utilize the online option, bid packages can be requested by calling the Purchasing & Contracting Department at (619) 236-6000.
1. Furnish the City of San Diego with Full Service Maintenance, Repair or Replacement of Roll-Up and Apparatus Doors at Various Locations within the Fire Rescue and Public Utilities Department, as may be required for a period of one (1) year from date of award, with options to renew for four (4) additional one (1) year periods, in accordance with the attached specifications.
Bid No. 10042369-14-N. Bid Closing Date: October 3, 2013 @ 3:00 p.m.
Dennis Gakunga
Director of Purchasing & Contracting
Pub Sep 19 -00114373


CITY OF SAN DIEGO
ORDINANCE NUMBER O-20294 (NEW SERIES)

AN ORDINANCE AMENDING CHAPTER 2, ARTICLE 7, DIVISION 27
OF THE SAN DIEGO MUNICIPAL CODE TO
REPEAL SECTION 27.2726, RELATING TO RECALL ELECTIONS.
---
This ordinance would amend Chapter 2, Article 7, Division 27 of the San Diego Municipal Code to repeal Section 27.2726, relating to recall elections. Section 27.2726 prohibits the counting of certain votes in recall elections, stating, “No vote cast for a candidate shall be counted unless the voter also voted on the recall question.” In 2003, a federal district court struck down a virtually identical law in the California Elections Code. The requirement that a voter must vote on both parts of a recall ballot to have his or her vote counted was held by the court to effect “a severe restriction on one's Constitutional right to vote” and to violate voters' First Amendment rights of free expression. Although the federal court decision does not apply to San Diego's election code, it is clear San Diego's similar law would not survive a legal challenge. Thus, this Ordinance would repeal the section.

This ordinance contains a notice that a full reading of this ordinance is dispensed with prior to its final passage, a written or printed copy having been available to the City Council and the public prior to the day of its passage.

Pursuant to Charter sections 275(c) and 295(d), this ordinance relating to elections may be passed by the Council on the date of its introduction, and shall take effect and be in force on the date of its final passage.

A complete copy of this ordinance is available for inspection in the Office of the City Clerk of the City of San Diego, 2nd Floor, City Administration Building, 202 C Street, San Diego, CA 92101.

Introduced and adopted by the Council of the City of San Diego on August 28, 2013, by the following vote.

YEAS: LIGHTNER, FAULCONER, GLORIA, COLE, KERSEY,
ZAPF, ALVAREZ, EMERALD.

NAYS: NONE.

NOT PRESENT: SHERMAN.


AUTHENTICATED BY:

BOB FILNER
Mayor of The City of San Diego, California

ELIZABETH S. MALAND
City Clerk of The City of San Diego, California

By: Jeannette I. Santos, Deputy

I HEREBY CERTIFY that the foregoing Ordinance was passed on the day of its final passage, to wit, on September 12, 2013, said Ordinance being of the kind and character authorized for passage by Section 16 of the Charter.

I FURTHER CERTIFY that the reading of said Ordinance in full was dispensed with by a vote of not less than a majority of the members elected to the Council, and that there was available for the consideration of each member of the Council and the public prior to the day of its passage a written or printed copy of said Ordinance.

ELIZABETH S. MALAND,
City Clerk of The City of San Diego, California.

By Jeannette I. Santos, Deputy.
Pub Sep 19 -00114318


CITY OF SAN DIEGO
NOTICE OF CITY COUNCIL PUBLIC HEARING
---
DATE OF MEETING: MONDAY, SEPTEMBER 30, 2013
TIME OF MEETING: 2:00 P.M.
PLACE OF MEETING: COUNCIL CHAMBERS, 12TH FLOOR,
CITY ADMINISTRATION BUILDING,
202 "C" STREET, SAN DIEGO, CALIFORNIA

PROJECT TYPE: Public Right-of-way Vacation and Coastal Development Permit, Exempt from CEQA,
Process Five
PROJECT NO: 294358
PROJECT NAME: PINAR PLACE VACATION
APPLICANT: Mark Brencick

COMMUNITY
PLAN AREA: Torrey Pines
COUNCIL DISTRICT: 1

FOR ADDITIONAL INFORMATION, PLEASE CONTACT
CITY PROJECT MANAGER/PHONE: John S. Fisher at (619) 446-5231 jsfisher@sandiego.gov

UNDER THE PROVISIONS OF THE PUBLIC STREETS, HIGHWAYS AND SERVICE EASEMENTS VACATION LAW AND FIXING A TIME AND PLACE FOR HEARING THEREOF, NOTICE IS HEREBY GIVEN
that the Council of the City of San Diego, California, will proceed under the provisions of the Public Streets, Highways and Service Easements Vacation Law to adopt a Resolution terminating the public right to use a certain street as shown on drawing 37279-B, located at 2144 through 2186 Pinar Place and 13610 Pine Needles Drive between Pine Needles Drive and Nob Avenue in the Torrey Pines Community Plan area, an area of 0.447 acres to be vacated.

PLEASE ACCEPT THIS AS A NOTICE TO INFORM YOU, as a property owner, tenant or interested citizen, that the Council of The City of San Diego, California will conduct a public hearing, as part of a scheduled City Council meeting, on the following project:

A Coastal Development Permit and Public Right-of-way Vacation to vacate an unused, undeveloped street located at 2144 through 2186 Pinar Place and 13610 Pine Needles Drive between Pine Needles Drive and Nob Avenue in the Torrey Pines community. No development is proposed by this action, a Coastal Development Permit is required to approve a public right-of-way vacation in the Coastal Overlay Zone.

This project is exempt from CEQA pursuant to State CEQA Guidelines Section 15305 (Minor Alterations in Land Use Limitations). This project is not pending an appeal of the environmental determination. The environmental exemption determination for this project was made on December 14, 2012, and the opportunity to appeal that determination ended January 9, 2013.

The final decision by the City of San Diego is not appealable to the California Coastal Commission. If you want to receive a Notice of Final Action, you must submit a written request to the City Project Manager listed above.

COMMUNICATIONS
This item may begin at any time after the time specified. Any interested person may address the City Council to express support or opposition to this issue. Time allotted to each speaker is determined by the Chair and, in general, is limited to three (3) minutes; moreover, collective testimony by those in support or opposition shall be limited to no more than fifteen (15) minutes total per side.

Those unable to attend the hearing may write a letter to the Mayor and City Council, Attention: City Clerk, City Administration Building, 202 "C" Street, San Diego, CA 92101 3862, Mail Station 2A; OR you can reach us by E-mail at: Hearings1@sandiego.gov or FAX: (619) 533-4045. All communications will be forwarded to the Mayor and Council.

If you wish to challenge the Council's actions on the above proceedings in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence to the City Council at or prior to the public hearing. All correspondence should be delivered to the City Clerk (at the above address) to be included in the record of the proceedings.

This material is available in alternative formats upon request. To order information in an alternative format, or to arrange for a sign language or oral interpreter for the meeting, please call the Clerk's office at least 5 working days prior to the meeting at 533-4000 (voice) or 236-7012 (TT).

Notice Date: 0901213 ELIZABETH MALAND
li SAN DIEGO CITY CLERK
Pub Sep 12, 19 -00113527


City of San Diego
PUBLISHED: Thursday September 19, 2013


Browse By Publication Date Months in 2013 Days in September 2013
2013 Public Notices
September
09/19/2013