• News
  • SAN DIEGO
  • Health

Dynalectric San Diego: Keeping health care facilities healthy

Health care -- its rising costs and economic impact -- is one of today’s hottest topics. It’s an arena in which Dynalectric has cornered the market. The company has newly constructed, modernized and expanded various facilities and institutions throughout the region for health care clients. The company’s portfolio ranges from established hospitals to medical office buildings and state-of-the-art outpatient facilities.

Dynalectric’s extensive industry experience and broad array of proven full-life cycle solutions make it a solid choice to help health care providers address their various complex challenges. Backed by substantial financial resources and a nationally recognized safety record, the company’s services include Design Build and Design Assist services, BIM, OSHPD expertise, maintenance and service. ISO 9001-certified for quality, the company also offers expert fabrication.

Dynalectric’s range of capabilities was in ample evidence at the UCSD Thornton Hospital Cardiovascular Center, where the company demonstrated it can deliver projects fast without sacrificing quality. This recently completed project is a 127,000-square-foot, four-story stand alone hospital. The facility consists of three operating rooms, one hybrid operating room, three catheterization laboratories, one hybrid catheterization laboratory, two floors of patient beds, a digital radiology center, CT room, emergency room, triage and administrative offices.

The scope of work for Dynalectric included: total electrical, electrical distribution, fire alarm, high-voltage systems, tele-data communications, power generation, lighting control and public address. This project required OSHPD approval and full BIM coordination of complex electrical systems. The entire project was completed on time and on budget.

For many health care organizations a phased delivery method, which integrates with existing and/or operating facilities, is often a necessity. The Sharp Chula Vista Emergency Department Expansion was a design-build project requiring such integration. This expansion doubled the capacity of the existing Emergency Department for a total of 48 beds and new endoscopy and bronchoscopy suites. Dynalectric expanded and upgraded the existing electrical distribution equipment and added a new lighting systems, lighting controls, fire alarm, nurse call and public address system. Dynalectric coordinated extensively with the hospital staff to ensure all hospital operations were maintained and uninterrupted throughout construction.

Technological expertise is another strength which has been highlighted throughout Dynalectric’s work with cutting-edge research facilities and laboratories. These facilities require specialized systems for vivariums and clean rooms in order to keep the research and experiments being conducted free from contamination. Dynalectric’s experience with these systems, day lighting mimic, mechanical controls and undisturbed power supplies guarantee clean and healthy environments for researchers to perform their work.

Dynalectric’s ability to provide expert end-to-end solutions tailored to clients’ unique business and operating requirements has made Dynalectric a leader in designing, building, powering, and servicing today’s complex and demanding health care facilities.

Founded in 1970, Dynalectric San Diego is a leading full-service electrical contractor serving Southern California.


-Submitted by Dynalectric.

User Response
0 UserComments