Project
Project Name
N City Wtr Reclamation Plt Electrodialysis Reversal # 6
Agency Name
City of San Diego
Agency Website
n/a
Contact Name
Asgharzadeh, Iraj
Contact Info
Asgharzadeh@sandiego.gov
Project Description
n/a
Cost Estimate
$1,682,796.00
Estimated Advertise Date
5/27/2009
Estimated Bid Opening Date
12/4/2009
Estimated Construction Start
3/24/2010
Estimated Construction Finish
9/20/2010
Project Type
MWWD
Trades
n/a
Daily Bid Openings
December 2009
<< December 3
December 4
December 5 >>
N City Wtr Reclamation Plt Electrodialysis Reversal # 6
Project Types
A 12 million gallon buried concrete tank and appurtenant facilities for the untreated water system.
Airports
Bridge Replacement
Building
Building + Electrical
Building/Horizontal
Civil
Civil + Utilities
Civil-infrastructure
Civil-Site Work
clean and treat bridge deck with methacrylate and replace joint seals.
CONSTRUCT 4 LANE HIGHWAY
Construct a 4 lane highway
Construct HOV lanes and direct access ramp
Construct the SB lanes and rehabilitate
Earthworks
Eectrical
Electrical
Expansion
Fire Protection
Flow Control Facilities
Freeway and bridge widening and bridge removal
GSD
guardrails
Horizontal
HVAC
Install changeable message sign
Install concrete median barrier
Install highway planting and automatic irrigation systems
Install new signal and construct retaining wall
Install ramp meters and HOV lanes
Install traffic signal and widen ramp
Install traffic signal, widen asphalt pavement, and apply slurry seal
Install two internal bulkheads & fasteners
Intersection
Mechanical
Meter Vault
Modernization
Modernize 100, 300B & 600 buildings
MWWD
New 1 story Classroom Bldg
New 1 story classroom building
New 2 story classroom
New 2 story classroom building
New 2 story classroom building 1200, New 1 story Shops/Industrial Tech. building
New 2 story classroom/Cafeteria building
New 2 story classroom/library building
New 3 story /Classroom/Library/Theater building
New Building
New Multi Purpose Bldg, Library, various bldg. modernizations
P&R
Raise the existing 220-foot dam by 117 feet
Recreation
Rehabilitate bridge deck
Rehabilitation of approximately 17,300 feet of existing Pre-stressed Concrete Cylinder Pipe (PCCP)
Remodel
Remove MBGR and replace with concrete barrier and crash cushions
Replace the existing City of San Diego San Vicente Reservoir Bypass Pipeline
Restore safety roadside rest area buildings and site
road improvements
Roofing
Safety roadside rest area restoration/ADA Compliance
School Modernization and Construction
School Modernization and expansion
Security
sidewalks
Site work
slope
Station Enhancements
SWD
TEO
trail
wastewater
WD
Yard Expansion
Company Info
|
Advertising
|
Feedback
|
Privacy Policy
|
Acceptable Use Policy
|
Contact Us
All contents herein
copyright
San Diego Source | San Diego Daily Transcript 1994-2009